让你5分钟就能看明白的装修装饰流程 来源:http://www.ssbb1.com 日期:2019-04-08 发布人:admin

1开工交底
1. Opening and closing
开工交底:即开工前,工程项目部、设计师与业主就工地施工的相关事项停止沟通,向业主交代施工的规划及验收节点。
Beginning of the project: before the start of the project, the project department, the designer and the owner stop communicating on the related matters of the construction site, and explain to the owner the planning and acceptance node of the construction.
原房验收:检查墙面、屋顶能否有开裂、空中能否平整,根底装备能否完好,空中能否漏水。
Acceptance and acceptance of the original house: check whether the walls and roofs are cracked, whether the air is flat, whether the underlying equipment is in good condition, whether the air can leak.
装修公司开工交底效果图
Result map of start-up of decoration company
2根底工程
2 Fundamental Engineering
维护:在撤除前必需要对屋内以及楼盘的公共局部做废品维护,既防止了后期施工形成损坏,也是文化施工。
Maintenance: Before removal, waste products must be maintained in the public parts of the house and the building, which not only prevents damage from later construction, but also prevents cultural construction.
撤除:承重墙一定不能拆!混凝土剪力墙也别拆!梁柱跟承重墙一样起到支撑的作用,同样不可撤除。
Remove: The load-bearing wall must not be demolished! Don't tear down the concrete shear wall! Beams and columns, like load-bearing walls, play a supporting role and are also irrevocable.
砌墙:为满足业主的适用需求性能,对功用规划停止处置。砌墙一定要坚持墙面的垂直平整!
Wall-building: In order to meet the applicable needs and performance of the owners, the functional planning is discontinued. Wall building must adhere to the vertical leveling of the wall surface! ___________
墙面挂网:一切新砌墙和墙体之间都挂满钢丝网,让墙体更好衔接,然后再批灰,避免墙面开裂。
Wall hanging net: All new masonry walls and walls are covered with wire mesh, so that better wall connection, and then batch of ash, to avoid wall cracking.
装修公司名雕根底工程维护图
Maintenance drawings of famous sculptures in decoration companies
3水电项目
3 Hydropower Projects
水电交底 :水电交底就是分离本人的运用习气,用彩色放样定好家里的位置点位。如插座、龙头、马桶、地漏的位置。
Hydropower Interpretation: Hydropower Interpretation is to separate my habits of use and to set the location of my home with color lofting. Such as socket, faucet, toilet and floor drain.
水电改造-开槽 :即开槽并布设水电管线,开槽一定要横平竖直,若是斜的弯的一片紊乱,后续施工不规范可能打穿管道。
Hydropower transformation - slotting: that is, slotting and laying hydropower pipelines, slotting must be horizontal and vertical, if the oblique bending is disordered, follow-up construction is not standardized may break through the pipeline.
水电改造-走线 :水电施工的优先准绳:一走顶,第二走墙,第三走地。假如全部走地,检修就要把地板掀起来,不便当检修。
Hydropower transformation - route: the priority criterion of hydropower construction: the first is roof walking, the second is wall walking, and the third is floor walking. If all go to the ground, the floor will be lifted up for overhaul, which is inconvenient for overhaul.
济南装饰公司
水电验收 :水路要打压测试、电路要通电验收。验收没问题后,才会填平修补墙面空中,把管线彻底躲藏起来。
Acceptance and acceptance of hydropower: the waterway should be tested and the circuit should be checked and accepted. After the acceptance is all right, the wall will be filled and repaired, and the pipeline will be completely hidden.
装修公司水电项目效果图
Effective Drawing of Hydropower Project of Decoration Company
4防水防潮
4 Waterproof and moisture-proof
卫生间防水防潮:沉降池防水涂刷到距空中完成面30公分以上的高度,墙身防潮请求涂刷高度不低于2.1米。
Toilet waterproof and moisture-proof: Settlement pool waterproof painting to the height of 30 cm above the air completion surface, wall moisture-proof request painting height not less than 2.1 meters.
闭水实验:卫生间、厨房、阳台等有水区域做好防水涂刷后,需求堵住下水管停止闭水实验,24小时后无水渗出到隔壁房间和楼下,才算闭水实验完成。
Water closure experiment: After waterproof painting is done in the water-bearing areas such as toilet, kitchen and balcony, the water closure experiment needs to be stopped by blocking the sewer pipe. After 24 hours, no water seeps into the next room and downstairs before the water closure experiment is completed.
木制品防水防潮:木制品要涂抹防潮光油,并用防潮珍珠棉与墙体隔开,防止水汽经过墙体渗入。
Wood products waterproof and moistureproof: Wood products should be coated with moistureproof varnish, and separated from the wall with moistureproof Pearl cotton, to prevent water vapor from penetrating through the wall.
装修公司名雕防水防潮图
Waterproof and moisture-proof drawings for famous carvings of decoration companies
5木工
5 carpentry
吊顶:吊顶所用木吊杆、木龙骨的含水率不得大于12%,天花木龙骨必需涂刷防火涂料做防火处置,预留中央空调的通风口和检修口。
Ceiling: The water content of wooden suspender and wooden keel used in ceiling should not exceed 12%. Ceiling keel must be coated with fire-proof paint for fire-proof disposal, and the ventilation and overhaul openings of central air conditioning should be reserved.
天花7字拐角工艺:天花吊顶封夹板时,转角处不能有接缝,采用“7”字型整板封板,以防开裂。
Craft of ceiling 7-shaped corner: When ceiling ceiling ceiling seal splint, there should be no joint at the corner. The "7" type whole plate seal is used to prevent cracking.
装修公司名雕吊顶效果图
Effect drawing of famous carving ceiling of decoration company
6油漆
6 paint
打磨:上底漆前先打磨润滑,以免呈现毛面;刷漆时来回不能超越三次,面板线条颜色不分歧,要处置到擦色分歧为止。
Grinding: Before applying primer, polish and lubricate to avoid the appearance of wool surface; brush back and forth can not exceed three times, panel line color does not differ, to deal with the difference until the rubbing color.
维护:油漆竣工后用透明薄膜维护。
Maintenance: The paint is maintained with transparent film after completion.
装修公司名雕刷油漆效果图
Paint effect drawing of famous sculpture brush of decoration company
7泥水
7 muddy water
修补找平:空中假如走了水电管或墙面有凹凸不平的中央,都需求用水泥回填平。
Repair and leveling: If water and electricity pipes or walls have uneven centers in the air, they need to be filled with cement.
贴砖:确认不会漏水就能够贴瓷砖了。
Tile sticking: Make sure that the tiles will not leak.
排水测试:贴完砖后需求在卫生间做排水测试,不论从卫生间的哪一个中央倒水,水都能顺利流下地漏,不积水。
Drainage test: After placing bricks, we need to do drainage test in the bathroom. No matter which central part of the bathroom pours water, the water can flow smoothly to the floor without water accumulation.
装修公司找平效果图
Leveling effect map of decoration company
8乳胶漆打底、裱糊
8. Printing and pasting of latex paint
基层处置:原有基层白灰根除洁净后,批灰层中间要挂满防裂纤维网,避免墙体乳胶漆因物体收缩,收缩等形成墙面不规则裂痕。
Grass-roots disposal: After the original grass-roots white ash is eradicated and cleaned, the batch ash layer should be covered with anti-cracking fiber mesh to avoid irregular cracks on the wall caused by shrinkage and contraction of the wall latex paint.
刷墙漆:腻子刮完后,就能够开端刷墙漆(一遍底漆,两遍面漆)或其他墙面施工材质(如壁纸、硅藻泥等),并做好维护。
Wall paint: After the putty is scraped, you can start to paint the wall (one primer, two topcoats) or other wall construction materials (such as wallpaper, diatom mud, etc.) and do a good job of maintenance.
装修公司刷墙漆效果图
Painting effect drawing of decoration company
9装置
9 device
厨卫主材装置:卫生间的马桶、地漏、八字阀、花洒、浴室柜、镜柜、五金件装置;
Kitchen and bathroom main material equipment: toilet, floor drain, eight-shaped valve, flower sprinkler, bathroom cabinet, mirror cabinet, hardware device;
厨房的橱柜、抽油烟机、灶台、水槽、水龙头装置;
Kitchen cabinet, lampblack machine, stove, sink, faucet device;
墙面背景、玻璃装置::原墙面基层批灰、打磨平整,喷乳胶漆使墙面到达润滑;玻璃装置必需上下通气,不能全封锁。
Wall Background and Glass Device: Gray batch, smooth grinding of the original wall base, spraying latex paint to lubricate the wall; Glass device must be ventilated up and down, not completely blocked.
开关插座装置:电工上门装置上开关插座及照明灯具,并逐一测试能否正常运用。灯具、开关装置完成后,硬装根本就大功告成了。
Switch socket device: Switch socket and lighting fixture on electrician door-to-door device, and test whether it can be used normally one by one. After the lighting and switching devices were completed, the hard-fitting was accomplished.
本文来自:济南装饰公司更多的内容请点击:http://www.ssbb1.com 我们将会为您提问的问题提供一个满意的服务,欢迎您的来电!
This article is from: Jinan Decoration Company, more content please click: http://www.ssbb1.com, we will provide you with a satisfactory service to ask questions, welcome your call!